Showing posts with label Joseph H. Boardman. Show all posts
Showing posts with label Joseph H. Boardman. Show all posts

Tuesday, January 18, 2011

This Week in Amtrak

ViewlinerImage by Madbuster75 via Flickr
From the Editors…
And now a (highly) condensed look at the year past through the eyes of This Week at Amtrak.

2010, A.D. [Amtrak Defined]
As we enter our eighth year of publication, we find the world of passenger railroading in a greater-than-usual state of flux. Obviously, the biggest curveball thrown may be summed up in three little words: High- Speed Rail. After the “Vision for High-Speed Rail” and High-Speed Rail guidelines of 2009, we waited in expectation for January 28, when $8 billion worth of specific American Recovery and Reinvestment Act rail projects would be announced. It took months for the euphoria to subside. Then came reality; mid-term election candidates began to run on platforms advocating stoppage of HSR projects in their respective states. Freight railroads found the punitive federal guidelines “surprising” and “frightening.”

Then things got interesting.

On January 5, after an initial one-year term as President, Joseph H. Boardman was granted (by the Amtrak Board) a permanent position. On January 11, an Amtrak press release announced, “AMTRAK READY WITH BIG PLANS FOR 2010 -- New Year brings major projects and new initiatives.” This was hardly the first announcement heralding “big plans.” As with so many other forward-looking statements of years past, this was generally received with a sigh. As events would later prove, however, some rather big things did actually happen.

March 6 saw the first Town Hall meeting co-sponsored by Amtrak and Trains Magazine. Well-attended and featuring the presence of Amtrak Chairman Tom Carper, as well as Joe Boardman, there were those inside the corporation who decried this “foamers’ forum.” Even so, there was positive dialogue about photography and updates on equipment rebuilding at the Beech Grove Repair Facility, using stimulus money. A train of three cars and a locomotive were on display for all in attendance to tour (and photograph).

March 31 was the end of an era at Amtrak. Cliff Black, long-time (and long-suffering) Chief of Communications and employee since 1981, retired. For years, it had been his quotes, his voice which represented Amtrak to the general public. Through each change of leadership at Amtrak, and there were several, the one constant had been Black's deft handling of the news media. Any of us seeking good honest information knew Cliff Black was the man to see. While keeping on-message for his employer, he never led the news media astray; an amazing feat in today's world of journalism. Suffice it to say, this is a retirement well earned and richly deserved.

July 23 brought what was perhaps the biggest, most jaw-dropping initiative undertaken by Amtrak all year, and possibly all decade: The order for 130 new Viewliner 2 single level cars with an option for 70 more to replace the remaining Heritage baggage cars and diners. Was this shocking turn due to a previously-unrealized corporate need? No. As far back as 15 years ago, Amtrak's then-president Thomas Downs described the remaining Heritage cars in service as “junk.” Was this, then, as a result of a sudden jump in demand for sleeping car space on eastern trains? No. Sleeper space has been at a premium, especially in the East, since the retirement of the last Heritage sleepers in 2006. Ever since the 50-unit fleet of Viewliner sleeping cars entered service in 1995-96, we have been waiting for the rest of the Viewliner fleet to supplant the last of the Heritage fleet. We have waited… and waited… and waited. When Amtrak announced, on January 11, “a comprehensive and detailed plan to replace and expand its fleet of locomotives and passenger railcars” they could have warned us that this time they really meant it.

The Washington Times of September 12 reported on a Congressional probe of the sudden ouster of Amtrak Inspector General Fred Weiderhold, the previous year. Quoting from draft copy, “Because of his expertise, the [Amtrak] Board viewed Weiderhold as a threat.” Also found were “excessive fees” paid to outside law firms by Amtrak’s Law Department and, due to the circumstances surrounding Mr. Weiderhold’s departure, “It was not a truly voluntary resignation as Amtrak management had suggested in public statements.” There was some attention given in the Halls of Congress which, thus far, has amounted to nothing beyond lip service. But as Chicago Cubs fans are used to saying, “maybe next year.”

On October 16, a Norfolk Southern freight train departing Enola Yard across the river from Harrisburg, Pennsylvania, en route to Hagerstown, Maryland and points South, derailed in downtown Harrisburg. The rear of the train was still west of the Amtrak station, precluding the eastbound Pennsylvanian from entering. Many will use such an incident to demonize the freight railroads and to call for building separate tracks. Ironically, that is exactly what NS has been attempting to accomplish in the area for a number of years. Currently, when freight trains to or from the south enter or depart Enola Yard, they are required to cross the Susquehanna River twice (and pass the Amtrak station), a process which adds hours to transit times. NS has been working with the State to rebuild a former connection on the south side of Enola Yard at Lemoyne. The process has been held up for the usual political reasons (concerning which a boxcar could not care less). Until this has resolution, efficiency will suffer. Passenger rail will suffer. Egos will continue to be stroked. A similar incident occurred July 2, and for what? For less than 1,300 feet of track. Sometimes the answer really is that simple.

Also in October came an admission of the obvious. One year earlier, the contract to run the Virginia Railway Express commuter service, held by Amtrak for 18 years, was awarded to the French company Keolis. Amtrak did not like this intrusion into its turf. As documented by veteran reporter Don Phillips, “The battle then turned bitter, and Amtrak and its unions turned nasty. Union officials made it clear to employees that if they signed with Keolis, they would be fired immediately by Amtrak and permanently blacklisted. Crews who agreed to stay with Amtrak not only received a $5,000 bonus but were guaranteed a job. Amtrak, meanwhile, even tried to hire crews laid off from New Jersey Transit who had been approached by Keolis. The idea was to prevent Keolis from hiring enough crews to run the system by takeover day, June 28.” Yet, in spite of all the chicanery and dirty tricks Keolis did begin service (albeit delayed) and continues to operate. By October of 2010, Amtrak President Joe Boardman finally admitted, “We know we did not provide the right answers,” and “I see a lot more competition coming forward.” Amtrak considers itself to be the sole keeper of American passenger railroading. Considering its isolationist history, this is understandable; however, the word is getting around that there are others willing to ante up to the table. Amtrak has promised to behave. Will it?

Finally, on December 20, Norfolk Southern and the Commonwealth of Virginia entered an agreement to reintroduce passenger service to Norfolk. This is funded by “an $87 million Rail Enhancement Fund grant” which, when translated into English, means these are state monies, not Federal or ARRA grant. Yes Virginia, there really are states who take the initiative in their passenger rail programs.

2010 promised to be the year of “High-Speed Rail.” Ultimately, it came in like a lion and went out like a lamb. HSR was touted as the savior of our economy; an engine for creating jobs in much the same way as the Interstate Highway System of two generations ago. Rhetoric was thick. Substance was lacking. The proposed fast trains look sleek and sexy, but where is the business case to justify them? No one is against creating jobs, but with at least $8 billion in the offing, the question is begged: Is this a good, sustainable transportation policy?

Perhaps the biggest story in passenger rail is the one that did not happen.

Amtrak’s manifesto of January 11 predicted, in part, “the purchase of several hundred single-level and bi-level long distance passenger railcars and more than a hundred locomotives.” New Viewliners were ordered in July, followed by a contract for new electrics in October. Unlike many of the HSR initiatives, these orders have had no political opposition. Yet as 2010 wrapped up, there were no “bi-level long distance passenger railcars” on the horizon. As pointed out by Andrew Selden, URPA Vice President, “This is the one application of capital available to Amtrak that promises a quick and positive return on incremental invested capital. No other investment opportunity, honestly accounted for using GAAP measures, offers anything even close to this. Yet Amtrak refuses to pursue it.”

As the year has drawn to a close, the same basic route map remains in place. Apologists are grateful the map has not shrunk any further. Advocates wonder why, in an era of so much talk of rail, the map is not growing. The Sunset Limited still does not venture any further East than New Orleans, and is carried on Amtrak’s daily status as "Hurricane`Katrina' Aftermath & Service Adjustments - Sunset Limited: Normal service resumed 03Nov05, with the exception of Trains 1 and 2 between Orlando and New Orleans."

True, there was much more talk about passenger rail this past year than in recent memory. The small order for equipment was positive, yet after so many years of benign neglect, this can hardly be counted as a fresh start. “What is needed most in 2011, following what happened in 2010, is a better, more rigid plan for creating new trains which have a higher guarantee of success and financial reward, instead of becoming yet another burden on the overburdened taxpayers,” said Bruce Richardson, URPA President.

As the afterglow of the latest surge in HSR interest fades into memory, it is clear that sleek, fast trains do not exist in a vacuum. Around the real high-speed world, fast trains succeed as part of a vast integrated network; the trains, by themselves, would be nothing more than pricey tourist attractions. Amtrak would appear to have figured this out, as evidenced by its current equipment orders, and wish list from last January. Unless projects of this type are embraced, to build upon the few successes of this past year, then the whole enterprise is for naught; hopefully, it will not be too little, too late.

Enhanced by Zemanta

Friday, November 12, 2010

This Week in Amtrak

Amtrak Coast Starlight (Train 14) northbound a...Image via Wikipedia
As with all journeys, this one begins with an itinerary. There are points of interest. There are schedules to be met. And, there is, of course, the occasional missed connection. As the new editors of this on-line publication, we shall attempt to keep this interesting and do so in a timely manner. We do not bring an agenda with us, but do believe in the free flow of news and ideas to that which unites us all together: the realistic belief in and rational expansion of passenger railroading in the United States. Therefore, without further ado, we would like to take a moment to introduce ourselves.

David Carleton has been in the engineering field for over thirty years; more than twenty of those years with an ENR top 500 civil engineering firm in Central Florida. Along the way, he has worked in railroad civil engineering and railroad electrification, as well as landmark preservation and intelligent mixed-use land development. He also has an extensive background in publishing railroad books for historians and enthusiasts, alike, by virtue of the fact that his family founded and operated the publishing house of D. Carleton Rail Books. David has made himself available here in the role of researcher and historian, so that all the lessons learned along the way can be put to their best use.

Daniel Carleton is a twenty-year veteran of the electrical power industry, with eighteen of those years spent in the nuclear field. He is now semi-retired, having attained the position of Supervisor of Mechanical Maintenance. Like his brother, he grew up around and in the world of railroading, and continues to draw parallels between these two branches of industry: railroads and power generation. Combining the context of railroading’s nearly two-century-old history with the strict attention to detail necessary in today’s environment, Daniel intends to be the vigilant eye on the ever-shifting landscape of passenger railroading.

We would also like to thank Jean Sopko, of Black Bear Wordsmiths (blackbearws@yahoo.com), for graciously accepting the task of proofreading our musings and ramblings. Jean has a B.A. in English. She has been a newspaper proofreader, newspaper archivist, and medical transcriptionist. She has also held several highly-technical positions in the electronics industry.

Many have been convinced, looking at the “modern” high speed trains of faraway lands, that history has nothing to teach us regarding the future of passenger railroading; however, as the old saying goes, “He who fails to learn his history is destined to repeat the seventh grade.” Sadly there are more seventh graders who are more prescient about the future of transportation than most adults. Another wise man once said, “Good ideas never go bad, they just sometimes are put on a shelf.” Shall we return to the days of steam, steel, and limiteds? No, that is not our vision; however, unless rational decisions based on proven formulas are made, the future of transportation, all transportation, is in jeopardy.

Our journey has just begun. When and where it will end is still unknown. So for now let us sit back, relax, and gaze out the large window as the scenery whisks by.

Waiter, there’s a High Speed Rail in my soup.

By Daniel Carleton

You know the party has only started when Charles “Wick“ Moorman, Chairman, President, and CEO of Norfolk Southern Corporation, begins his statements in regard to passenger trains with, “Get the damn things off my railroad.”

After the roar of laughter settled down, day one of this year‘s Passenger Trains on Freight Railroads conference, presented by Railway Age magazine, was underway. Afterward, Moorman acknowledged his appreciation for passenger trains, having ridden them to school every day in Great Britain. Hardly a stuffy or stodgy individual, Moorman proved to be quite congenial and self-effacing. He sees his company’s relationship with Amtrak as “strong,” a position this gathering of railroad professionals would not deny. He made one fact quite clear: passenger trains on his freight railroad means 79 mph, maybe 90 mph in certain circumstances, but definitely not “High Speed Rail.” He also made it very clear that the increased track maintenance will not be borne by his railroad or stockholders.

Moorman was quite concise that every corridor and potential corridor for passenger trains is different; they are “not all the same.” He pointed to three areas where current and future services are welcome: (1) Virginia — the increase of service by extension of a Richmond train to Lynchburg is seen as a success. Norfolk to Petersburg makes a lot of sense, but a connection will have to be built between the former N&W and SCL at Petersburg, after which one would “bounce your way to Washington” (a good-natured jab at his primary competition, CSX). The Commonwealth of Virginia is shouldering the cost of these services and upgrades. (2) Chicago — the grade separation at Englewood, which will raise a Metra commuter line over a busy NS freight line (also shared by numerous Amtrak trains), is one of many great projects in that area, improving freight and passenger service. (3) North Carolina — work continues in this state to continuously improve passenger service, and NS is committed to this work.

Then Moorman addressed two areas that have caused great concern to the industry, those being the now reconsidered Federal guidelines for high-speed rail, and Positive Train Control. He described the Federal guidelines as “surprising to us” and “frightening to us.” The reward of passenger trains is slight, to the freight railroads. Then a call to any seeking to run a new passenger service: “Keep the word `risk’ in mind.” Whereas many may see the benefits of running passenger trains, it is the freight railroads who weigh the risk. As for PTC, it is a well-intentioned but bad piece of legislation, with an estimated price tag of $10 billion for the industry. This is going to be a big distraction to the railroads for the next five years. NS has estimated two-thirds to three-quarters of its track will require PTC.

Following that was a panel discussion on the National Rail Plan, chaired by Al Engel on his first day as Amtrak’s new Vice President for High Speed Rail. The Plan is a project by the FRA. As it is limited to 120 pages, the Plan is a strategic vision for the future, and an answer to Congress when it asks, “Show us your High Speed Rail plan?” FRA replies, “We don’t have an HSR plan, we have a National Rail Plan.” Even so, there were many useful tidbits of information brought out in this two-hour segment. The freight hauling system in the United States currently moves 40 tons of freight per person, per year. The goal of the Plan is to realize an increase of intermodal (trailers or containers moving greater than 500 miles) on the railroads from about 23% today, to 50%. The largest roadblock to building new intermodal terminals is not NIMBYs, but the environmental permitting process; this is a critical issue for the Plan. The expected cost of applying PTC to a single locomotive is $60,000-70,000.

Don Itzkoff, who will be moving to GE Transportation, then gave us an update on how things stand in Washington, DC. Simply put, HSR is now a higher political target. Everyone is feeling his way around this new scheme of transportation with the mindset of “play the game, then write the rules.” Of the more than $10 billion (soon to be over $11 billion) set aside for HSR, only $1 billion has been spent; however, rail is now very visible on Capitol Hill. Rail is now very much part of the surface transportation discussion, and rail is now speaking with one voice.

Our luncheon speaker was none other than Joseph Boardman, President and CEO of Amtrak. He started off by joking that his education in Agriculture Management at Cornell qualified him for Amtrak’s top spot. Despite his wit and spry manner, he looked tired and concerned, as though the weight of the whole world was on his shoulders. Even so, he did attend the entire morning, and most of the afternoon sessions. He was quick to point out that despite the conference title of Passenger Trains on Freight Railroads, talk of High Speed Rail kept “sneaking” in. Unlike most of the participants who stuck to the ‘where and when’, Boardman seemed compelled to answer ‘how and why’ he is, where he is, and what he intends to do about it. His appreciation for public transit came with the gas lines of 1973 and a national lack of desire to fix the problem. Even now it is already too late to provide balanced transportation for the nation. Amtrak needs a fundamental change in its culture — it has visibly lost support due to its arrogance – and to this end, Boardman seeks to instill the three parts of humility into those in his charge: inclusion of all, being collegial, and pursuing continuity. He said later on that he wants the people in key positions to be able to make those decisions on their own with the proper input. Is this perhaps a move away from the micromanagement so prevalent in state agencies? Time will tell.

Boardman acknowledged that his work is cut out for him. He noted that in the 1930s the number of passenger cars in the United States was around 65,000. By the late 1940s the number was down to about 30,000. Today, Amtrak stables less than 1400 passenger cars. As regards the latest order for rolling stock from CAF USA, everything except the stainless steel will be domestic, since they could not find a domestic source.

After lunch, representatives from Veolia Transportation delivered an interesting discussion on Cognitive Distraction and Attentional Error, which included actual cab video of a commuter Railroad Engineer verbally acknowledging a restrictive signal, yet still throttling up his train as though it was clear. Fortunately, he and the oncoming train did stop prior to an impact. Much research has been done to study the mind and mental health of those operating our trains nationwide, and there is still much to learn. It should be noted that the Chatsworth wreck was not discussed outright due to the ongoing investigation in which the panel is involved.

Next, a representative discussed what has been done and what is proposed in the Pacific Northwest. Like NS, Burlington Northern Santa Fe has been a cooperative partner in passenger rail, but has also made it clear that the maximum speed it will allow on its railroad will be 90 mph.

Then Al Fazio of Bombardier Transportation North America, who has overseen the build and start-up of NJ Transit’s River Line interurban in southern New Jersey, spoke on Extended Temporal Separation. For years, the River Line has been running non-compliant (crash standard) vehicles on the same tracks used by heavy freight trains protected by positive separation and lockout of one service or the other. He pointed out that the FRA defines systems as either `rail transit systems’ or ‘short haul passenger railways’. The decision is based on the `purpose of the trip’. If it is a rail transit system, then they may use non- or near-compliant equipment with temporal separation. If it is a short haul passenger railway, then the equipment must be compliant. This will be important going forward, as Fazio pointed out there are no more abandoned rail lines left to convert to light rail. The next step will be shared use.

The day closed with a sobering panel discussion, “Safety and Security: the Basics of Counterterrorism.” The panelists were quite dismayed over the cancellation of the second set of tunnels under the Hudson River; not because of the money lost in contracts, but due to lack of redundancy that presently exists in a heightened security environment. After a review of worldwide terrorist actions prior to 9-11, it was obvious that threats and sabotage against railroads is nothing new. Even so, the ‘Homeland Security Model’ developed and adopted after 9-11 does not fit all. There are five steps for counterterrorism on the railroad: (1) integrate thoroughly, ( 2) evaluate constantly, (3) know the threat, (4) foster vigilance — employees and rail fans, and (5) shift the balance.
Enhanced by Zemanta